5 Fill and compact the gravel
Use 20 mm angular stone, not round pea shingle, which rolls. Fill in two 50 mm layers and tamp each one hard.
A treated timber frame filled with compacted gravel. It drains, copes with a gentle slope and costs far less than concrete: a weekend job for two people with hand tools.
Gravel suits most timber, metal and plastic sheds up to about 10x8 ft. Check these four things first.

Measurements are for an 8x6 ft shed. For another size, keep the same margins and depths.
Peg out a rectangle 150 mm bigger than the shed floor on every side: 2.75 x 2.15 m for an 8x6. Measure both diagonals; when they match, the corners are square.
Remove 100 to 150 mm of soil, roots and all, and keep the bottom flat. Tread or tamp it firm; loose soil sinks later.
Screw 150 x 47 mm treated timber into a box at the pegged size. Set it level both ways with a spirit level, packing or digging under it, then fix it to stakes driven inside.
Line the bottom with landscape fabric, overlapping joins by 150 mm, and staple it up the inside of the frame. It stops weeds and keeps gravel from mixing into soil.

Use 20 mm angular stone, not round pea shingle, which rolls. Fill in two 50 mm layers and tamp each one hard.

Drag a straight board across the frame to screed the stone flush. Check level in both directions and top up any dips.

Lay treated bearers across the gravel, 400 to 600 mm apart, and build the shed on them. Doors that close cleanly mean the base is right.
Quantities for an 8x6 ft shed on a 2.75 x 2.15 m base, 100 mm deep.
Typical UK price ranges for the materials list above. Your local merchant may differ.
| Item | Example cost |
|---|---|
| Treated timber frame, 4 lengths | £40 to £60 |
| Stakes and screws | £15 to £20 |
| Weed membrane | £10 to £15 |
| 20 mm gravel, one bulk bag, delivered | £75 to £130 |
| Treated bearers | £20 to £30 |
| Plate compactor hire, one day (optional) | £35 to £50 |
| Total, without hire | £160 to £255 |
Buy gravel loose from a builders' merchant if you can collect it; delivery is often a third of the price of a bulk bag.
A hand tamper costs less than one day of compactor hire and does the job on a base this size.
Each pick below is an example of the kind of product to look for, not a tested recommendation. Links marked “Check the price” are affiliate links.
The questions readers ask most about this job.
100 mm of compacted gravel is enough for most garden sheds. On soft ground, dig 150 mm and add a layer of MOT Type 1 under the gravel.
Not for the base itself. Round pebbles roll and never lock together. Use angular crushed stone, 10 to 20 mm.
Yes. Bearers lift the floor off the stone so air moves underneath and the floor stays dry.
Usually, by a good margin, and it needs no mixing or curing time. Concrete is worth it for large or heavy buildings.
On a gentle slope, yes: set the frame level and fill deeper at the low end. Steeper ground needs a retaining edge or piers.